Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/inos8336/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/inos8336/public_html/wp-includes/functions.php on line 6114

Notice: Function Perflab_Server_Timing::send_header was called incorrectly. The method must be called before headers have been sent. Please see Debugging in WordPress for more information. in /home/inos8336/public_html/wp-includes/functions.php on line 6114
3D Animation Arus Listrik Kilang » INOVIS
Project Summary

3D Animation Arus Listrik Kilang

Introduction

At the factory, the electric current is carefully regulated to ensure stable operation. They have two main sources of supply, PLN and internal power plants. These two sources provide strong redundancy, preventing production interruptions. They optimize production by shifting supplies when needed. Advanced monitoring technology keeps voltage and frequency within safe limits, protecting equipment and employees. The use of internal energy sources also contributes to the environment. We are committed to providing reliable, efficient, and sustainable electric current to support successful and high-performing refineries.

Technology & Client

Timeline Project

A collaborative project between Inovis and a refinery company produced a comprehensive 3D animation of electric currents over a time period. In the initial stages, planning and in-depth research were carried out to understand the structure and electricity flow in the refinery. Then, the development of the 3D model began with a focus on two power sources: PLN and the internal Power Plant. After the development phase, testing and optimization are carried out to ensure visualization accuracy. In the final stage, the 3D animation is completed and implemented in the factory environment. This project helps refinery managers understand and optimize energy flows, resulting in higher operational efficiency.

Gallery Project